We supplied the first parcel of pipes for the South Stream pipeline to Bulgaria

In June 2014, United Metallurgical Company shipped the first batch of pipes for the construction of the first offshore run of the Southern Stream gas pipeline, from Rostov-on-Don to the port of Burgas in Bulgaria. Pipes with a diameter of 813 mm and 39 mm thick walls are made according to the DNV-OSF101 (2010) standard and South Stream Transport’s technical specifications.